Describes waveform generation, visualization, and transmitter performance analysis

LTE Toolbox™ provides functions that let you measure transmitter performance characteristics. The examples featured here demonstrate transmitter modeling and performance analysis. Communications Toolbox™ and DSP System Toolbox™ System objects provide additional quantitative tools for measuring system performance, and graphical utilities for visualizing waveforms.

Apps

LTE Waveform GeneratorCreate, impair, visualize, and export LTE waveforms
LTE Throughput AnalyzerGenerate throughput curves for physical downlink shared channel (PDSCH) conformance test analysis

Blocks

Waveform From Wireless Waveform Generator App blockWaveform From Wireless Waveform Generator AppWireless waveform source exported to Simulink

Functions

expand all

lteRMCDLDownlink reference measurement channel configuration
lteRMCULUplink reference measurement channel or FRC configuration
lteTestModelDownlink test model configuration structure
lteRMCDLToolGenerate downlink RMC waveform
lteRMCULToolUplink RMC or FRC waveform generation
lteTestModelToolGenerate downlink test model waveform
lteEVMError vector magnitude calculation

Objects

expand all

comm.ConstellationDiagramDisplay and analyze input signals in IQ-plane
spectrumAnalyzerDisplay frequency spectrum of time-domain signals (Since R2022a)
timescopeDisplay time-domain signals
dsp.ArrayPlotDisplay vectors or arrays
comm.ErrorRateCompute bit or symbol error rate of input data
comm.EVMMeasure error vector magnitude (EVM) of received signal

Topics