Activity Final Node
Terminate entire activity
Since R2024a
Description
An activity final node is represented by a solid gray circle enclosed in a white circle.
When a control token enters the Activity Final Node block, the entire activity diagram terminates. An activity final node does not have any output flows.
Create an Activity Final Node
You can create an activity final node by dragging and dropping the Activity Final Node block from the palette on the left to any location on the canvas.
Version History
Introduced in R2024a