Global Optimization Toolbox - 'TimeLimit' ignored

Hello,
in some simulation studies the Pattern Search was used and within the psoptimset 'TimeLimit' was used as stopping criteria. Unfortunately this criteria was ignored, so the runs go on and dont break after having consumed a defined amount of time. Do you have an answer for this behaviour?
I will try another criteria now ('MaxFunEvals' -> the algorithm finishes after a certain amount of function evaluations). This behaviour only occured within the Pattern Search algorithm.
Thank you in advance for your help!

Réponses (1)

Alan Weiss
Alan Weiss le 14 Juin 2016
Modifié(e) : Alan Weiss le 14 Juin 2016

1 vote

As I explained in this Answer, there is a bug in patternsearch when run in parallel that causes the time limit not to be honored. I think that you are doing the right thing by using MaxFunEvals instead.
Sorry about the bug.
Alan Weiss
MATLAB mathematical toolbox documentation

1 commentaire

Felix Kamhuber
Felix Kamhuber le 15 Juin 2016
Hello Alan,
thank you for your quick response and the workaround mentionned in the other thread!
Felix

Connectez-vous pour commenter.

Catégories

En savoir plus sur File Operations dans Centre d'aide et File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by