Effacer les filtres
Effacer les filtres

how to decrease time of for loop

1 vue (au cours des 30 derniers jours)
muhammad ismat
muhammad ismat le 3 Avr 2018
if I have data X=[1 3; 1 4; 2 3; 2 6] (where max number in X (6) represent the number of nodes) that represent the edges between nodes of network and i want to calculate the remaining edge =[1 2; 1 5;1 6;2 4;2 5;3 4;3 5;3 6;4 5;4 6;5 6]
thus i calculate the all links(result) then remove X from it.
but when i have max number of nodes (say 8000) , the following code take a long time . So I want another code take a short time.
u=max(max(X)); %u is the number of nodes in graph
result = zeros(u*2,2);
ri = 1;
for ii=1:u
for jj = ii+1:u
result(ri,:) = [ii jj];
ri = ri+1;
end
end
  1 commentaire
muhammad ismat
muhammad ismat le 4 Avr 2018
isRowToRemove = ismember(result,X,'rows');%test result is member in X or not, it is removed if it is member in X.
result(isRowToRemove,:) = [];

Connectez-vous pour commenter.

Réponses (0)

Catégories

En savoir plus sur Loops and Conditional Statements dans Help Center et File Exchange

Tags

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by