I am trying to create a logical lookup between 3 date vectors. Vector a is the lookup value (a date), Vector b is a start date, c is an end date. a is a larger size than b and c, which are both the same size.
I want to return a logical response (1) when a is b<=>c.
The vector size seems to be the main problem when trying to write this. I know there is a simple way to do it, but cant find the answer.
3 commentaires
Jan
le 24 Mai 2018
What does "b<=>c" mean? What exactly is a "date vector"? Please provide some input data.
Réponse acceptée
Guillaume
le 24 Mai 2018
Assuming R2016b or later:
sum(a >= b' & a <= c')
In earlier versions
sum(bsxfun(@ge, a, b') & bsxfun(@le, a, c'))
a, b, c must be date numbers
Plus de réponses (0)
Voir également
Catégories
En savoir plus sur Calendar dans Help Center et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!