I am new in Matlab (sorry)
I have to arrays a= [10, 20, 30, 40, 50] and p = [5, 3, 1, 2, 4]. I am looking a method to change the order of a in function of p (this array is an index vector). For example
newa = [50, 30, 10, 20, 40]

2 commentaires

Stephen23
Stephen23 le 18 Déc 2018
Very basic MATLAB concepts, like how to use indexing, are explained in the introductory tutorials:
Rather than spending time registering on this forum, writing a question, waiting for some random stranger to help you with very basic MATLAB concepts... you can actually learn lots of important and useful concepts yourself simply by doing those tutorials.
Thanks for the tips!

Connectez-vous pour commenter.

 Réponse acceptée

madhan ravi
madhan ravi le 18 Déc 2018
a(p)

2 commentaires

thanks!
madhan ravi
madhan ravi le 18 Déc 2018
Modifié(e) : madhan ravi le 18 Déc 2018
Anytime :) , if my answer worked make sure to accept the answer.

Connectez-vous pour commenter.

Plus de réponses (0)

Catégories

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by