Hi, I have a simulink model and I would to know that what is the maximum the timing value can be assigned for simulation ?
Maximum = ???
>> sim('modelName','StartTime','0','StopTime',Maximum,'FixedStep','0.01');
Thank you.
0 commentaires
Réponse acceptée
Mundrathi Venugopal
le 1 Fév 2019
I'm not sure about the maximum time that you can specify for a model.
However If you want to run the model continuously until you stop, you can assign the stop time as below.
set_param(bdroot,'StartTime','0','StopTime','Inf','FixedStep','0.01');
sim(bdroot);