rtwbuild using Parallel Computing Toolbox

I have a very large model that contains over 100 reference models that I generate code for. Needless to say, it takes a very long time to build using rtwbuild. How can I use the Parallel Computing Toolbox to cause rtwbuild to use multiple workers as it generates the code for each reference model?

Réponses (1)

Kaustubha Govind
Kaustubha Govind le 23 Août 2012

1 vote

Yes, I think the parallel build feature that was introduced in R2009a should help you achieve what you need.

2 commentaires

Peter
Peter le 23 Août 2012
I was hoping that it would. However, after reading the documentation, it is unclear what the mechanics are to actually implement it. From my understanding, PCT is meant for speeding up your own code using things like parfor and spmd. How would I use it to speed up a single call to a built-in Matlab function like rtwbuild?
Peter
Peter le 23 Août 2012
Sorry, I missed your link above.

Connectez-vous pour commenter.

Catégories

En savoir plus sur Multicore Processor Targets dans Centre d'aide et File Exchange

Question posée :

le 22 Août 2012

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by