Provide Duty Signal delay
Afficher commentaires plus anciens
Hello,
I am trying to give three duty signal to a block. Such as D1+D2+D3=1. So what ever the combination of these duty is the total answer should be 1. I have used transport delay but it is not giving me accurate delay. You can see in screenshort.
My objective is to have variable duty (like it can be changed instaneously through a controller) and as soon as D1 end D2 should start which is then folled by D3=1-D1-D2
Can you please help me with this model. I am attaching model too. In screenshot the delay D3 is giving a slant which is not desireable. It should be like D1.
Réponse acceptée
Plus de réponses (2)
Muhammad Hammad Uddin
le 27 Août 2019
0 votes
3 commentaires
Renato SL
le 28 Août 2019
Will the values be periodic?
Or they will keep changing until the end of simulation?
Previously, I was thinking of using the Stair Generator or Repeating Sequence Stair to feed values to the Pulse Generator block.
[TL;DR] : To have the duty cycles change through time, you cannot use only Pulse Generator.
I believe you need to define your own signal generator, using MATLAB Function block or Simulink Function block, that can take into account the fact that the duty cycle will change. I imagine you should take into account the simulation time and relate it to a predefined set of possible values to determine the value of duty cycle and therefore, the form of the signals.
Or use another block.
Muhammad Hammad Uddin
le 28 Août 2019
Muhammad Hammad Uddin
le 28 Août 2019
0 votes
2 commentaires
sasikanth chandana
le 29 Août 2019
As time period of input signal is constant. You can create variable delay using random generator code in MATLAB Ex: Delay range=(0,1)*T T time period of signal
(0+(1-0)*rand(1,10))*T
This will create required delay in terms of time T and feed it to transportation delay
Renato SL
le 29 Août 2019
So to be clear (Sasikanth mentioned it above), is the period of the input signal constant ( is the duty cycle constant) and your concern is only the variable delay? Variation of duty cycle is not the issue?
I saw that you have asked it in a new question, so if I have something that might help, I will answer there.
Communautés
Plus de réponses dans Power Electronics Control
Catégories
En savoir plus sur Startup and Shutdown dans Centre d'aide et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!
