Help for optimal production setup
Afficher commentaires plus anciens
Hello. I wanna simulate the optimal setup for my operation to achieve the highest possible effecienty.
My constraints look like this. Product 1 have to go trough R -> A -> B -> D -> C ->F -> S and so on for the other products. R and S are locked as start and finish.

As seen next i wanna arrange my operations in the best way so i can use the lowest number og idealized steps

Hope someone has done something similar and can help me.
Best regards
Niels
Réponses (0)
Catégories
En savoir plus sur Manual Performance Optimization dans Centre d'aide et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!