Help for optimal production setup

Hello. I wanna simulate the optimal setup for my operation to achieve the highest possible effecienty.
My constraints look like this. Product 1 have to go trough R -> A -> B -> D -> C ->F -> S and so on for the other products. R and S are locked as start and finish.
As seen next i wanna arrange my operations in the best way so i can use the lowest number og idealized steps
Hope someone has done something similar and can help me.
Best regards
Niels

Réponses (0)

Catégories

En savoir plus sur Manual Performance Optimization dans Centre d'aide et File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by