Good afternoon, in this file a PWM converter is connected to a grid. My question is whether it is necessary or not to perform a load flow before simulating this file.
If not could you please suggest other cases where a previous load flow is required to set the values of the blocks? Thanks in advance!
Juan Cabeza
jaca1810eng@gmail.com
Research Gate: Juan Cabeza
Twitter: @jaca1810eng
0 commentaires
Réponse acceptée
Joel Van Sickel
le 8 Juin 2020
Hello Juan,
due to the power electronics involved and how they are modelled in this model, the load flow option would not work. Instead, this model was run to steady state, and those states were saved and then put in as initial conditions.
Here are some models that use load flow. Unfortunately, if your main goal is the power electronics simulation, this type of work flow won't be useful for you.
Regards,
Joel
Plus de réponses (0)
Communautés
Plus de réponses dans Power Electronics Control
Voir également
Catégories
En savoir plus sur Power and Energy Systems dans Help Center et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!