Unit commitment by dynamic programming method

unit commitment (plant scheduling) based on the forward DP method
8,8K téléchargements
Mise à jour 5 juil. 2011

Afficher la licence

Unit commitment based on an advanced forward DP technique. The user can choose to keep track of more than one predecessor (or even all) thus overcoming the drawback of DP method that it cannot "see" the optimal solution in some cases.
Program constraints are min. and max. power output of generators, their min. up and down times, ramp rates, required reserve. Start-up costs can be constant (cold), hot/cold or exponential. Production cost function can be either linear or quadratic. The results can be printed in summarized or in detailed form. Program works in time resolution of 1 hour.

Citation pour cette source

Vladimir Stanojevic (2026). Unit commitment by dynamic programming method (https://fr.mathworks.com/matlabcentral/fileexchange/32073-unit-commitment-by-dynamic-programming-method), MATLAB Central File Exchange. Extrait(e) le .

Compatibilité avec les versions de MATLAB
Créé avec R2008a
Compatible avec toutes les versions
Plateformes compatibles
Windows macOS Linux
Catégories
En savoir plus sur Quadratic Programming and Cone Programming dans Help Center et MATLAB Answers
Version Publié le Notes de version
1.0.0.0