How can I do a Monte Carlo simulation for 1000 runs on this operation?
3 vues (au cours des 30 derniers jours)
Afficher commentaires plus anciens
Please can someone help to verify that this is the proper way to run a monte carlo simulation on this code?
% A = T(:,1); %Column vector
A = [71.213; 74.499; 79.175; 54.163; 83.008; 52.615];
B = length(A); %size of column (number of elements)
t = 0; %Variable to store harvest time
number_of_runs = 1000;
for n = 1:number_of_runs
for i = 1:B
H = A(i);
while H > 0
H = H - randi([5 10]);
t = t + randi([2 4]);
end
end
end
t_mean = t/number_of_runs;
disp(t_mean);
2 commentaires
John D'Errico
le 8 Mar 2023
Modifié(e) : John D'Errico
le 9 Mar 2023
Hard to say. That is the proper way to simulate what you simulated. Is it the proper way to simulate what you think you were simulating? That is impossible to tell, since we see only the code you wrote. So perhaps you need to explain what is the goal.
Réponse acceptée
Torsten
le 9 Mar 2023
Maybe you mean:
% A = T(:,1); %Column vector
A = [71.213; 74.499; 79.175; 54.163; 83.008; 52.615];
B = length(A); %size of column (number of elements)
number_of_runs = 1000;
T = zeros(number_of_runs,1); %Variable to store harvest time
for n = 1:number_of_runs
t = 0;
for i = 1:B
H = A(i);
while H > 0
H = H - randi([5 10]);
t = t + randi([2 4]);
end
end
T(n) = t;
end
plot(1:number_of_runs,T)
t_mean = sum(T)/number_of_runs;
disp(t_mean);
Plus de réponses (0)
Voir également
Catégories
En savoir plus sur Monte-Carlo dans Help Center et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!