Change order of Area and Constantline in the same plot
Afficher commentaires plus anciens
Hi all,
Edit: it turned out the line was behind the area from the start; it just looked like it was in front because of the low alpha. My mistake!
With an updated alph = 0.9 in the code below, you can clearly see that the line is actually at the back:

The position of xline is set by its Layer parameter: using either Layer = 'top' or Layer = 'bottom' works to shift it, here it is with Layer = 'top':

So... all is well. Will know to check that for next time!
### Previous post:
I am trying to plot an area and a ConstantLine (xline) objects on the same plot. I would like the line to be behind the area. However it seems impossible to get this, instead the line keeps staying in front of the area, no matter how I try to change it (e.g. with uistack). I have found many posts related to similar problems here but none that solve it.
Here is my example:
%% Parameters
nbins = 100;
min_value = -5; % min possible value of curve
max_value = 10; % max possible value of curve
alph = 0.2;
bw = 0.5;
%% Data that will be plotted
xi = linspace(min_value,max_value,nbins); % where the density will be estimated
bin_size = median(diff(xi));
x1 = normrnd(1,1,[200,1]);
f1 = ksdensity(x1,xi,"Bandwidth",bw,'Function','pdf');
%% Plotting
figure()
% plot the line
% Note, I try to set the 'Layer' property to bottom here as in https://www.mathworks.com/matlabcentral/answers/667763-constantline-always-on-the-top?s_tid=srchtitle
% but it still plots it 'on top' of the next plot which is an area and
% doesn't accept a 'Layer' option
this_l = xline(2.5, 'k', Layer='bottom');
hold on
% plot the area
this_a = area(xi,f1,0,"FaceColor",'b','EdgeColor','none','FaceAlpha', alph);
xlim([-20, 20])
% => This shows the line on top of the area, even though the area was plotted
% after
%% Attempts to change order
% Trying uistack to switch the order
uistack(this_a, 'top');
uistack(this_l, 'bottom');
% This doesn't change anything
% Trying this solution:
% https://www.mathworks.com/matlabcentral/answers/667763-constantline-always-on-the-top?s_tid=srchtitle
Sxh = struct(this_l); % Get undocumented properties (you'll get a warning)
Sxh.Edge.Layer = 'back'; % Set ConstantLine uistack
% This doesn't do anything
This is the result:

Any suggestions on how to get this line to be behind the area? Thank you!
- El
Réponse acceptée
Plus de réponses (2)
Mathieu NOE
le 25 Avr 2025
Modifié(e) : Mathieu NOE
le 25 Avr 2025
hello
xi was missing so I created a dummy one
maybe not the smartest solution, but it does the job :
%% Parameters
xi = linspace(-20,20,100);
nbins = 100;
min_value = -5; % min possible value of curve
max_value = 10; % max possible value of curve
alph = 0.2;
bin_size = median(diff(xi));
bw = 0.5;
%% Data that will be plotted
x1 = normrnd(1,1,[200,1]);
f1 = ksdensity(x1,xi,"Bandwidth",bw,'Function','pdf');
%% Plotting
figure()
hold on
% plot the line
x_line = 2.5;
y_line = interp1(xi,f1,x_line,'next');
plot([x_line x_line],[y_line max(f1)*1.2],'k');
% plot the area
this_a = area(xi,f1,0,"FaceColor",'b','EdgeColor','none','FaceAlpha', alph);
xlim([-20, 20])
1 commentaire
El
le 25 Avr 2025
Catégories
En savoir plus sur Graphics dans Centre d'aide et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!

