Import elements of an array from workspace

3 vues (au cours des 30 derniers jours)
Islam Elnady
Islam Elnady le 22 Jan 2018
Commenté : Islam Elnady le 25 Jan 2018
Hi, I've created this model in Simulink to import elements of an array of waypoints (x,y) from workspace on a sequential basis so that a Robot can follow them, point after point.
The index selectors switch to the next index by increasing the data store memory variable "A" by "1" when the Robot reaches the current waypoint within 100 m.
When I run the model the variable "A" jumps to the final value (16 in this case) at the first sample time of simulation. why? any help?
Below is the matlab function block:
function y = fcn(u,n)
global A;
if u<100 && A<n
A = A+1;
end
if A>n
A=n;
end
y = A;
end

Réponses (1)

Manuel
Manuel le 23 Jan 2018
Have you already tried using a LookUp table?
regards mscharff

Catégories

En savoir plus sur Block Libraries dans Help Center et File Exchange

Produits

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by