Question on the selection of threshold in "Wind Turbine High-Speed Bearing Prognosis" example.
1 vue (au cours des 30 derniers jours)
Afficher commentaires plus anciens
Question on the selection of threshold in "Wind Turbine High-Speed Bearing Prognosis" example.
If the historical data is available, for example, there are 100 wind turbines with run-to-failure historical data. Is there any way to calculate a "common" threshold for the 100 wind turbines as well as the new coming turbines instead of selecting last day as the threshold? Since each wind turbines may have different'last day'.
The predictive maintenance examples and predictive maintenance toolbox are very impressive and really practical , thanks a lot.
Miracle
2 commentaires
Image Analyst
le 15 Sep 2018
Modifié(e) : Image Analyst
le 15 Sep 2018
Yes it is.
For reference, I'll post the link you forgot to post: https://www.mathworks.com/examples/predictive-maintenance/mw/predmaint-ex34579581-wind-turbine-high-speed-bearing-prognosis?s_tid=answers_rc2-2_p5_MLT
Réponses (1)
Xiaoxing Wang
le 17 Fév 2021
If you have 100 samples, instead of calculating the threshold, you can try the similarity model to estimate RUL as an alternative approach.
0 commentaires
Voir également
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!