Visualizaing time series properly

3 vues (au cours des 30 derniers jours)
Hemz
Hemz le 25 Avr 2019
Commenté : Hemz le 4 Juil 2019
I created a timeseries data of load profiles for on grid electricity consumption for a 24 hour period. To represent the time for running 24-hour equipment like refrigerators my excel file had 0:00 to 23:59 as running time, however when matlab generates a load profile it has 0kw in the last 24th cell. I used time2num to convert the time in my excel to num in matlab. How can I fix this?
  2 commentaires
Walter Roberson
Walter Roberson le 25 Avr 2019
plot_loads() calls upon bar2(), which I cannot find anywhere.
You should avoid using sum as the name of a variable, as that conflicts with using it as the often-used function.
Hemz
Hemz le 4 Juil 2019
Thanks

Connectez-vous pour commenter.

Réponses (0)

Catégories

En savoir plus sur Instrument Control Toolbox Supported Hardware dans Help Center et File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by