problem in running time of my project
Afficher commentaires plus anciens
hi, my project running time make me crazy.
I write a script with only 3 " for " but when I click on run button it takes 166 second to run that.
I try it in other computers and Ihave same problem so I realize that the problem is in my script.
with same inputs my friend write another script and we both get same output but his script ran in 3 seconds and my script runs in 166 seconds. (why?) (we have same laptops)
my laptop's specs :
cpu = corei7 5500U
ram = 8 GB
here is my code please tell me where is the problem that I cant get answer in few seconds.
clc
clear
tic;
Input = [ 5 12 0.02
4 20 0.1
6 50 0.01
4 76 0.02
3 100 0.04
4 155 0.04
3 197 0.05
1 350 0.08
2 400 0.12];
n=Input(:,1);
cap=Input(:,2);
FOR=Input(:,3);
COPT=zeros;
copt1=zeros;
Prob=zeros;
%copt 1
for i=0:n(1)
copt1(i+1,1) = cap(1)*i;
copt1(i+1,2) = (nchoosek(n(1),i))*(FOR(1)^(i))*((1-FOR(1))^(n(1)-i));
end
l=1;
for i=1:size(copt1,1)
COPT(l,1)=copt1(i,1);
COPT(l,2)=copt1(i,2);
l=l+1;
end
%problem is starts from here
for i=2:size(cap,1)
a=size(COPT,1);
for j=1:n(i)
for k=1:a
COPT(l,1)=cap(i)*j + COPT(k,1);
l=l+1;
end
end
end
toc;
2 commentaires
Shubham Gupta
le 7 Nov 2019
Modifié(e) : Shubham Gupta
le 7 Nov 2019
What was the output that you were expecting? Is it an array of dimesion (504000 x 2)? Did your friend also get the same anwer? Major problem with the last loop is variable 'a' is changing inside the loop and making COPT bigger and bigger. I am not sure if that's what you intended to do ? Why I think that is because, you haven't defined "l" before the start of your third loop and you are using same "l" that you get from second loop.
f4r3in
le 7 Nov 2019
Réponse acceptée
Plus de réponses (0)
Catégories
En savoir plus sur Logical dans Centre d'aide et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!