Controller in the feedback path?
Afficher commentaires plus anciens
What happens if the controller of a closed-loop system is placed in the feedback path before the summation point instead of bewtween the summation point and the plant to control?
Is it allowed to do so? If so, what are the main differences???
Thanks!
Réponse acceptée
Plus de réponses (0)
Catégories
En savoir plus sur Simulink dans Centre d'aide et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!