How to continue testing with SDV to extend results?
Afficher commentaires plus anciens
I am testing a large industrial Simulink model with SDV in order to get the values of structural coverage metics. I originally set the Maximum Analysis Time to be 20 hours. After the 20 hours, the testing stops and I was able to generate a coverage report (progress is shown in first image). However, all of the objectives have not been processed yet, and I want to give the analysis more time to complete. How do I do this without starting the testing over from scratch? Even when I Load Earlier Results that are in the resulting sldvdata.mat file, I am still waiting for the second round of testing to surpass the original objectives processed/satisfied over an hour later (second image). How can I make SDV continue testing where it left off?
Original test progress (20 hours)

Second round of testing

Update: 7+ hours later, my second round of testing is now at the same spot that the original testing stopped at. Obviously it is re-doing some of the analysis to get to this point.
1 commentaire
Pat Canny
le 13 Nov 2020
Hi Monika,
Thanks for your question. I have passed this along to the Simulink Design Verifier engineering team.
- Pat
Simulink Design Verifier Product Manager
Réponse acceptée
Plus de réponses (0)
Catégories
En savoir plus sur Simulink Design Verifier dans Centre d'aide et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!