how to loop for a multiple variables array code?

1 vue (au cours des 30 derniers jours)
Fercho_Sala
Fercho_Sala le 22 Avr 2021
Commenté : Jan le 26 Avr 2021
Hello everybody. Just looking for some help about how to do a ´loop´ for the following code. The idea is to do the same the code does for every 30 minutes identified in the ‘C’ array (sometimes the 'C' array is not always 24h). Dataset attached. Thank you.
D = d;
t = time;
t = datevec(t);
[Ut,ia,idx] = unique(t(:,4)); % Unique Hours
Counts = accumarray(idx, 1); % Items In Each Hour
C = mat2cell(D, size(D,1), Counts);
%%setting variables
pws1=smoothdata((C{1,1}(:,[1:30])),'movmedian',3,'omitnan'); % 30 minutes for the period of time (00:00 - 00:30)
%%indentifiying peaks
ax1=subplot(2,2,1); % (2,2,1) for the first 30 minutes, (2,2,2) for the second group of 30 minutes, and so on...
load parts;
[pks,locs,widths1,proms2] = findpeaks(pws1(:,end),y,'MinPeakHeight',35); widths1;
findpeaks(pws1(:,end),y,'Annotate','extents','WidthReference','halfprom');
text(locs+0.5,pks,num2str((1:numel(pks))'));
legend('Filtered Data','Peak','Prominence','Width');
ax1.YAxisLocation = 'right';
ax1.XDir = 'reverse';
ax1.XGrid = 'on';
ax1.YGrid = 'off';
title ('Peaks (00:00 - 00:30)');
ylabel('Peaks identification','FontSize',9,'FontName','Arial','color','default');
xlabel('Altitude/km','FontSize',9,'color','default');
yticklabels('');
xlim(ax17,[75 95]);
ylim(ax17,[16 50]);
camroll(-90);
%%number of peaks found
numberpks1 =(findpeaks(pws1(:,end),y,'MinPeakHeight',20));
  5 commentaires
Fercho_Sala
Fercho_Sala le 26 Avr 2021
@Jan ok I got it, but the issue is that '0:30:1440' will always work for 24h. For that reason I said "C is not always 24h" the number of arrays in 'C' changes and also the number of columns in each array of 'C' ;) , but your answer is interesting.
Jan
Jan le 26 Avr 2021
0:30:1440 produces 30 minute intervals over 24 hours. Afterwards my code checks, how many elements are matching in the current time slot, so the data do not need to have 24 hours.

Connectez-vous pour commenter.

Réponse acceptée

Steven Lord
Steven Lord le 24 Avr 2021
Consider converting your data array (with the time information) into a timetable and calling retime on it to aggregate each 30 minutes worth of data to compute the max in each period?
Or if your windows need to overlap use the movmax function.
  1 commentaire
Fercho_Sala
Fercho_Sala le 26 Avr 2021
Sir, @Star Strider any coment about this code? Thanks.

Connectez-vous pour commenter.

Plus de réponses (0)

Produits


Version

R2020b

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by