How do I run parallel bloomberg blp timeseries?
Afficher commentaires plus anciens
Hi, I am trying to get multiple intraday securities from bloomberg and noticed that the runtime is extremely long(each timeseries takes about 10-20 seconds). Is there away to run the blp timeseries in parallel to save time since it will take an hour just to run 100-200 securities?
Sample of my code. %Declare ProductList Array
% Grab data (Run timeseries in parallel)
[Data_Trade] = timeseries(blp,Product1,{floor(now)-90,floor(now)-1},5,'Trade');
[Data_Bid] = timeseries(blp,Product1,{floor(now)-90,floor(now)-1},5,'Bid');
[Data_Ask] = timeseries(blp,Product1,{floor(now)-90,floor(now)-1},5,'Ask'); %end parallel computing
%%Run data calculations
Thanks
Réponses (1)
Shashank Prasanna
le 18 Juil 2013
0 votes
There is no way for me to test this out since I don't have blp connection, but if you have the parallel computing toolbox, try doing the above in a parfor loop. Have the 'Trade', 'Bid' etc in a variable which can be indexed with the loop variable.
Catégories
En savoir plus sur Bloomberg Desktop dans Centre d'aide et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!