I have been encountered with "No convergence achieved within maximum number of iterations" error. What can I do to fix the error? Please advise me

Réponses (1)

Ilya
Ilya le 27 Juil 2013
You can increase the maximal number of iterations. See 'options' in the doc or help for svmtrain.
  2 commentaires
hamed
hamed le 27 Juil 2013
thank you for answer i increase MaxItr to inf, but did not fix the error.
Ilya
Ilya le 28 Juil 2013
Then do one or all of:
  • lower the box constraint
  • increase tolkkt
  • specify a positive value for kktviolationlevel
  • try a different kernel function