Wireless Ad-hoc Network Delay Analysis and Visualization
Version 1.0 (1,94 ko) par
Ardavan Rahimian
This code simulates delay in a wireless ad-hoc network with the interplay between Physical and Data link layers.
The code simulates a wireless ad-hoc network, considering the effects of transmission delay, queueing delay, and propagation delay on packet transmission between nodes. The code sets parameters for the simulation, creates random node positions within an area, and calculates distance, adjacency, and delay matrices. It then simulates packet transmission between nodes, computes delays, and visualizes the network and delays between nodes on a graph.
Citation pour cette source
Ardavan Rahimian (2024). Wireless Ad-hoc Network Delay Analysis and Visualization (https://www.mathworks.com/matlabcentral/fileexchange/128854-wireless-ad-hoc-network-delay-analysis-and-visualization), MATLAB Central File Exchange. Récupéré le .
Compatibilité avec les versions de MATLAB
Créé avec
R2023a
Compatible avec toutes les versions
Plateformes compatibles
Windows macOS LinuxTags
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!Découvrir Live Editor
Créez des scripts avec du code, des résultats et du texte formaté dans un même document exécutable.
Version | Publié le | Notes de version | |
---|---|---|---|
1.0 |