Simulink test multiple sequences for harness
8 vues (au cours des 30 derniers jours)
Afficher commentaires plus anciens
Does a test harness in simulink test have a one to one relationship to a test sequence? Or can I add multiple test sequences to a harness?
If not I don't see the point of a test sequence harness.
0 commentaires
Réponses (1)
Paul Urban
le 26 Fév 2020
Yes it is possible to put multiple test sequences inot a test harness. You can use variants to control which Test Sequence is active during a specific test.
2 commentaires
Paul Urban
le 2 Mar 2020
Unfortunately there isn't an example of test sequences with variants but there is doc on using Variants that could be applied to a Test Sequence. https://www.mathworks.com/help/simulink/slref/variant-subsystems.html
It also is possible to have more than one test sequence within a single test sequence block in a test harness byt using the when-decomposition pattern. In the Test Sequence editor:
- create a parameter, e.g., ScenarioId,
- create one top-level step and use the context menu to enable when-decomposition,
- create two or more child steps underneath with the following content:
- Scenario1 when ScenarioId == 1
% MATLAB code for scenario 1
- Scenario2 when ScenarioId == 2
% MATLAB code for scenario 2
- …
- UnknownScenario
assert(false, 'unknown scenario %d', ScenarioId)
- in the base or model workspace, create a variable named ScenarioId with the scenario number that you’d like to run.
See https://www.mathworks.com/help/sltest/ug/introduction-to-test-sequences.htmlfor more details about when-decomposition.
Voir également
Catégories
En savoir plus sur Inputs dans Help Center et File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!